You are here:

East Gippsland, Victoria

Key Route Upgrade

As part of East Gippsland Shire Council’s Scriveners Road upgrade, RamShield® Guardrail and MSKT End Terminals were installed along this 5.4 km section into Lakes Entrance. Scriveners Road is a critical alternative route for high two-way traffic and heavy vehicles in emergencies. The project also included road widening, culvert extensions, gravel re-sheeting, and full sealing.

Project Requirements

The project needed barrier systems that could:

✔️ Protect vehicles on a key alternative route for high traffic volumes
✔️ Integrate with widened and upgraded road infrastructure
✔️ Meet MASH Test Level 3 performance
✔️ Be durable under frequent heavy vehicle use

Solution and Results

RamShield® Guardrail, with MSKT End Terminals, was installed to provide full compliance roadside protection. The system contains and redirects vehicles while meeting the 2020 MASH standards.

Key results:

✔️ MASH-compliant roadside protection
✔️ Safe integration with road widening and culvert works
✔️ Low-maintenance barrier system
✔️ Safer for heavy and commuter traffic on the 5.4 km section

Get in touch to learn more about RamShield® guardrail systems and solutions.

Project Details

Make an Enquiry